In November, 2014, I-TEC upgraded YWAM’s electrical infrastructure. In September, 2018, I-TEC met with YWAM Board of Directors and presented a single-phase solar system proposal to cover the administrative functions of the campus. After discussion, the Board requested a three-phase proposal that would cover the electrical needs of the entire campus.  The campus is currently operating on single-phase.  If converted to three-phase, the existing infrastructure would need upgraded.  Three-phase from EDH is located adjacent to the YWAM campus.  It is unknown whether EDH would be willing to serve YWAM from this circuit or what the monthly costs would be.  On September 12, 2019, I-TEC presented a three-phase system proposal to the YWAM Board of Directors.  They are currently seeking funds to install this system.